OLT Equipment failure Friday 1st July 2022 08:30:00
We've found an issue with a legacy OLT that is requiring a full power cycle. This will interrupt services in the Lloyd Lane area for 20-30 minutes as the equipment resets.
The equipment has finished resetting, and appears to be back in operation.