At approx. 14:38 1/11/2021, construction crews in the Cedar Rapids area cut a 144 and 288 fiber cable that carries CFU's OTN transport ring. Link protection automatically kicked in and circuits are re-routing around the cut. ETR is estimated around 2100 tonight, but could take longer.